How to install electromagnetic flow meters
How to install electromagnetic flow meters?
2.Should be installed in the line up
3.In the opening discharge pipe installation, the pipe should be installed at the lower
4.If the pipeline than 5m,exhaust valve is necessary
5.Control valves and shut-off valve should be installed in downstream of the sensor
6.Sensor must not be installed on the pump inlet and outlet should be installed in the pump outlet;
7. Installed in the Wells
1.Should be installed in the lower part of the horizontal and vertical place, avoid installed in the pipe top and vertical to the touchpad;
2.Should be installed in the line up
3.In the opening discharge pipe installation, the pipe should be installed at the lower
4.If the pipeline than 5m,exhaust valve is necessary
5.Control valves and shut-off valve should be installed in downstream of the sensor
6.Sensor must not be installed on the pump inlet and outlet should be installed in the pump outlet;
7. Installed in the Wells